Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Blasting Notices

Stony Road Residential Development – Blasting Notice

Blasting for the new development on Stony Road at Bentley Drive will occur on Wednesday, February 5th between 11AM and 4PM. 

Please be advised that ROCK WORK INC. has been retained by CVA, Inc. to provide drilling and blasting services to facilitate rock excavations at the Stony Road Project located off Stony Road in Warwick Township. ROCK WORK INC. has the necessary federal, and state permits to conduct blasting operations, and the blasting personnel have valid Pennsylvania Department of Environmental Protection blasters’ licenses.

As required by Warwick Township, ROCK WORK INC retained the services of Vibra-Tech Engineers, Inc. and offered pre-blast inspections of those properties located within 500 feet of the blast areas. You may contact them at 1-800-233-6181 Please reference the “Stony Road Project” when calling.

The blasting is necessary to facilitate trench rock and bulk rock removal for the proposed subdivision. The blasting is being insured by the Lancer Insurance Company, PO Box 87790, Vancouver, WA 98687. Policy GL80298622.
The blasting will be seismically monitored to confirm the blast induced ground vibration levels are within regulatory limits, and therefore, not capable of having an adverse effect on any neighboring structures.